CLIENT:
NIOC = National Iranian Oil Company
PPL = PetroPars Limited
PROJECT LOCATION:
Iran,Persian Gulf – Assaluyeh - Tombak
27.73 N , 52.15 E
DBC’S INVOLVMENT:
• Site Selection & Surveys
• Masterplan Studies
• Conceptual Design Studies
• Basic Design Studies
• Management Consultant in Detail Design Preparation
• Construction Supervision & Management