• Extensive Masterplan Studies along the southern Caspian Sea for a Shore- Protection project to deal with fairly severe storm surge, wave action and gradually rising sea-level.
• Design and Construction Supervision of Rubble-Mound Seawalls in five locations along the Caspian Sea with severe coastal erosion and water-level rise.
• Feasibility Study for water pipe-line crossing Between the Qeshm Island and the mainland in Bandar-Abbas.